REVIEWITDocumentation
ProcedureUp to date · verified on 3 September 2026

What you keep, and why

Machine translation, not yet reviewedThis page was translated by a model from the French version, which is authoritative. Read the French version.

01In a nutshell #sec_4d0d24f2

Retention is not a checkbox: it is set category by category, it is observed in the report, and it is suspended by a reasoned measure when a procedure requires it.

02Where to find it #sec_c23ce8a2

Settings › Retention policy. This page is the front of the subject; two links at the top of the page lead to the two other screens.

ScreenAnswers
Retention policyHow long is each thing kept, and from when?
Retention reportWhat did the last cycle do, and why is the rest still there?
Preservation measuresWhat is suspended, by whom, until when?

03The durations #sec_bc0d8abf

Thirty-four data categories, grouped by trigger — campaign closure, issuance of proof, end of subscription, over time. The group answers the first half of the only question we really ask: from when, and for how long?

The nominal duration is not a disappearance date. Complete erasure occurs thirty-five days later, when the backups have expired. The right column writes it on two lines — how long, then from what — because confusing the two promises a disappearance that has not yet occurred.

Some durations are a minimum. The screen then displays at least . A campaign snapshot lives at least its nominal duration, and beyond as long as an unpurged proof depends on it. Displaying the value alone would be false.

You cannot disable a duration, and this is not a missing function. The list of units — days, weeks, months, years — does not know how to express infinity, and the ten-year cap closes the last path. A retention without term is not a retention, it is a forgetting to erase that no one will be able to explain.

Some lines are not set at all. An imposed duration is a legal obligation or data for which the publisher is responsible; a dependent duration strictly follows the object it accompanies. The screen says it with a padlock rather than graying out for no reason.

The derogation

Going beyond the profile limits requires a derogation, and it is recorded — it is not requested . The decision is made outside the product: legal advice, committee, internal arbitration. REVIEWIT provides the mechanism and the trace, not the arbitration.

Three fields are mandatory, and each answers a question that an auditor will ask years later: the reason, the approver — named with their identifier, because “the RSSI” is untraceable ten years later — and the review date . Lifting a derogation does not delete it: it has founded a retention, and the file must be able to explain it afterwards.

04What is actually purged #sec_a5a1e708

The screen displays an honest count: N categories out of 34 are actually purged . The others are not forgotten — they have no mechanism, and saying so is better than displaying thirty-four durations most of which would not apply to anything. A displayed but unapplied policy creates false proof of compliance.

A category can be purged without any line disappearing. When several categories share the same record, the purge is done field by field: the content leaves, the proof of delivery remains. The screen announces it — applied — content emptied — because a reader checking in the database would find their lines and conclude that the system is lying.

05The report #sec_a69c9127

It does not demonstrate what has been deleted: it explains what has been kept . The dark map is its heart — kept while eligible — and it is the part that the auditor reads.

Four reasons for retention, each with its three columns: who can act, when it is resolved, what usage restriction . Without them, a number per reason still leaves the question “so what?” unanswered.

No zero where nothing counts. A reason for which no mechanism measures the objects bears not counted, in dotted lines. A zero would affirm that nothing is kept under this title, which would be false.

And a counter that exists nowhere else: the number of categories that have not deleted anything at all. An all-green report may mean that the system is dead; this counter exists so that silence does not go unnoticed.

06Preservation measures #sec_7e4f6ae9

A measure suspends the purge of its target and what depends on it. It does not delete it: at the end, the purge resumes in the next cycle.

Placing a measure requires four things, and none are decorative:

FieldWhy it is mandatory
ReasonIt is the piece that makes the measure opposable — a procedure reference, a foundation
Date of reasonIt is conclusive. A measure placed after a deletion request covering the same scope is a signal of non-compliance
DeadlineNo unlimited duration: a hold without term does not exist
ReviewAt the latest at the deadline — a review scheduled after the term would never take place

The radius of action is calculated at the time of placement, never copied onto the held objects. This is what allows the lifting to trigger no processing: there is nothing to undo, the measure simply ceases to be found.

Lifting requires its own reason. It is the most exposed gesture of the two: placing protects, lifting removes a protection.

07The two silent failures #sec_07d6e553

A cycle that no longer deletes anything is identical to a cycle that had nothing to do. This is why each pass leaves a line in the log even when it purges nothing, and the report counts the categories that remained at zero. Without this line, a failed device and a resting device are indistinguishable.

A measure whose review is overdue still holds—but no one has confirmed that it should hold. This is the only red on the measures screen, and it deserves this treatment: a hold that has become unenforceable is more dangerous than an absent hold, because it looks like a valid hold.

08To remember #sec_7ae9ae73

  • The nominal duration is not the disappearance date: count thirty-five more days.
  • At least is not an approximation: it is a floor, and a proof can exceed it.
  • You do not deactivate a duration. If you are looking for this button, the question lies elsewhere.
  • The count « N out of 34 » is the most honest line on the screen. Read it before the durations.
  • A conservation measure without term does not exist, and an overdue review is not a detail.
Esc
↑↓ navigate↵ openSee all results →